Commercial Drywall

Commercial Drywall Contractor in Toronto

Steel stud framing, boarding, taping and ceilings for office, retail, hospitality, institutional and multi-unit projects across Toronto and the GTA. Priced from your drawings, built inside your schedule.

  • WSIBClearance certificate on request
  • Insurance$2M general liability
  • Rated assembliesBuilt to ULC listings
  • Self-performedFraming, board and tape
For GCs, Developers and Property Managers

The commercial drywall sub that reads the drawings before it prices them.

Crew reviewing drawings on a framed hotel floor before layout

True Drywall Contracting is a commercial drywall contractor serving Toronto and the GTA from Richmond Hill, with 5+ years on site. We work as the interior wall and ceiling trade on general contractor-led projects: hotels, office and retail fit-outs, institutional buildings, warehouses and multi-unit residential.

We self-perform steel stud framing, boarding, taping and T-bar ceilings. One trade partner for the interior scope means fewer scope gaps at buyout, one point of contact for your site superintendent, and one crew that owns the wall from track to final coat.

Request a Commercial Bid
Commercial Scope

What we self-perform on commercial projects in Toronto.

Every item below is carried by our own crews. Adjacent trades are coordinated, not subcontracted out of sight.

  • Steel stud framing Light and heavy gauge interior partitions, deflection track, bulkheads, soffits and furring, framed to layout.
  • Drywall boarding Standard, Type X, moisture and mould-resistant and abuse-resistant board. Exterior gypsum sheathing where specified.
  • Taping and finishing Level 3 to Level 5. Skim coat for critical lighting, feature walls and dark or glossy paint.
  • Fire-rated assemblies Rated partitions, demising walls and ceiling assemblies built to ULC-listed systems, with documentation.
  • Shaft walls Elevator, stair and mechanical shaft enclosures using shaftliner and C-H stud systems.
  • Acoustic assemblies STC-rated partitions with resilient channel, staggered studs and sound attenuation batts as specified.
  • T-bar and acoustic ceilings Suspended grid and tile in offices, corridors and back-of-house, coordinated with lighting and diffusers.
  • Drywall ceilings and bulkheads Framed and boarded ceilings, light coves, curved bulkheads and reveals.
  • Insulation Thermal batt and sound attenuation insulation in partitions and ceilings within our scope.
  • Head-of-wall and firestopping Top-of-wall detailing and penetration sealing where carried in our contract.
  • Repairs and retrofits Patching, water damage and phased renovation work in occupied commercial buildings.
  • Closeout documentation ULC system references, product data sheets and field verification records for inspection and turnover.
Also in Scope
On Site

Commercial work in progress and complete.

All Projects
Steel stud framing on a hotel guest floor
Framing
Steel stud partitions
Boarded drywall ceiling before taping
Boarding
Ceiling boarded
Paint-ready drywall columns in a hotel lobby
Finishing
Lobby, paint-ready
Completed hotel guest corridor
Complete
Guest corridor
Where We Work

Commercial sectors across Toronto and the GTA.

Each sector has its own ratings, sequencing and finish expectations. The scope letter reflects the building in front of us, not a template.

Working With General Contractors

What your project manager gets from us, before and after award.

Bidding and takeoffs

Send the architectural set, wall type schedule, reflected ceiling plans and specs. We quantify by wall type, ceiling type and finish level and return a bid with inclusions, exclusions and unit rates for changes. Tell us the closing date and we will confirm we can meet it.

Pre-construction and submittals

ULC system selection against the rated assemblies on the drawings, product data for board, compound and grid, and a mobilization date mapped to your trade sequence. Insurance and WSIB certificates arrive before the first crew does.

Sequencing on site

Layout and framing after slab and MEP coordination, boarding after rough-in inspections, taping ahead of the painter. Field changes are documented the same day. Deficiencies are cleared before we call the work complete.

Prequalification

Documents available on request.

WSIB clearance certificate

Issued before award and refreshed at each payment cycle, so your accounts payable never waits on us.

Certificate of insurance

$2M commercial general liability, with your company named as additional insured where the contract requires it.

Form 1000 at mobilization

Registration of Constructors and Employers completed for your project and kept on site as the regulation requires.

Health and safety records

Site safety documentation and crew training records, including WHMIS and Working at Heights.

ULC system references

Listed assembly numbers, product data and field verification records for rated walls, shafts and ceilings.

Closeout package

Statutory declarations, holdback documentation and lien waivers as your contract calls for them.

Our Process

Clear from bid to sign-off.

01
Scope Review and Bid

We review drawings, specifications and site conditions, then price by wall type, ceiling type and finish level. You receive a written bid with inclusions and exclusions listed.

02
Pre-Construction

Submittals, ULC system selection and a mobilization date confirmed with your project manager. WSIB clearance and insurance certificates are issued before the crew arrives.

03
Execution

Layout, framing, boarding and taping proceed in sequence with your other trades. The floor is cleaned each shift and field changes are documented the same day.

04
Inspection and Closeout

Walkthrough with your team, deficiencies corrected, then field verification records, holdback documents and lien waivers delivered for turnover.

Finish Levels

Drywall finish levels for commercial work.

The specification sets the level. We confirm it room by room in the bid so there is no debate at the painter's walkthrough.

Level 3

Tape embedded and two coats over joints and fasteners, sanded. Specified where a medium or heavy texture, or a heavy-grade wallcovering, will follow. Common in back-of-house, storage and service rooms.

Level 4

Three coats over joints, fasteners and accessories, sanded smooth. The standard for painted commercial walls and ceilings in flat or eggshell finishes under normal lighting. Most office, retail and corridor walls are Level 4.

Level 5

Level 4 plus a full skim coat across the surface. Specified for critical lighting conditions, glancing natural light from large windows, dark or semi-gloss paint, and feature walls in lobbies and boardrooms. Level 5 costs more in labour and time, so we flag where the drawings call for it and where the lighting suggests it should.

Rated and acoustic assemblies

Finish level does not change the fire rating, but the assembly detailing does. On rated walls we follow the listed system for board layers, fastener spacing and joint treatment, and we document it. Read more on fire-rated drywall assemblies in Toronto.

FAQ

Commercial drywall, answered.

Common questions from general contractors and property managers in Toronto and the GTA before engaging a drywall sub.

Yes. Most of our commercial work is as the drywall and steel stud subcontractor on GC-led projects across Toronto and the GTA. We report to your project manager and site superintendent and work inside your trade sequence.
Yes. Send the architectural set, wall type schedule, reflected ceiling plans and specifications. We return a scoped bid broken out by wall type, ceiling type and finish level, with inclusions and exclusions listed. Tell us your bid closing date and we will confirm we can meet it.
Yes. Active WSIB coverage and $2M commercial general liability insurance. Clearance certificates and certificates of insurance are issued before mobilization and at each payment cycle on request.
We self-perform steel stud framing, boarding, taping and ceilings with our own crews. One trade partner carries the interior wall and ceiling scope, which means fewer scope gaps at buyout and one point of accountability on site.
We are a non-union, open-shop contractor, which is the norm for tenant improvement, retail, hospitality and private commercial work across the GTA. If a project is designated union-only, tell us at bid stage.
Yes. Crews are scaled to your critical path and phased around other trades. Noisy or dusty work can be moved to evenings or weekends in occupied buildings. The site is cleaned at the end of every shift.
Yes. Rated partitions, demising walls, shaft enclosures and ceiling assemblies are built to ULC-listed systems as specified in the drawings. We provide system references, product data and field verification records for inspection and closeout.
Level 4 for standard painted walls and ceilings, Level 5 skim coat where critical lighting, dark or glossy paint, or feature walls demand it, and Level 3 in service areas where a heavy texture or wallcovering follows. The level is confirmed room by room in the bid.
Single-floor office fit-outs through to full-building hotel, warehouse and multi-unit projects. Send the scope and target dates and we will confirm capacity and timing.

Request a Bid

Have a commercial drywall project in Toronto or the GTA?

Send the drawings and your target dates. We will review the scope and return pricing with inclusions and exclusions spelled out, or set up a site walk for renovation work. Levelling bids? See what a drywall bid should include.

Request a Commercial Bid
Architectural drawings on site for a commercial drywall project in Ontario