Office Fit-Out Drywall Contractor in Toronto and the GTA
Steel stud partitions, sound-rated demising walls, Level 5 feature walls, bulkheads and T-bar ceilings for tenant improvements in occupied buildings. Phased around tenants, priced from the drawings, turned over clean.
Fit-outs run on the tenant's move-in date. We plan backwards from it.
True Drywall Contracting frames, boards, tapes and installs ceilings for office and tenant fit-outs across Toronto and the GTA. We work as the interior wall and ceiling sub to general contractors, and directly with property managers and landlords on smaller suite turnovers and floor renovations.
We know the rhythm of an occupied building: freight elevator bookings, quiet hours, security sign-in, dust control at the hoarding and a floor left clean every night. Noisy or dusty work moves to evenings or weekends where the building requires it, and the scope is priced with that phasing in mind.
Request a Fit-Out BidDrywall, framing and ceilings for office and retail fit-outs.
How we keep the rest of the building working while we build your floor.
Freight elevator bookings, dock windows, security sign-in and quiet hours are built into the schedule. Deliveries are staged on the floor so corridors and lobbies stay clear.
Hoarding and floor protection go up before the first cut. Framing, cutting and sanding move to evenings or weekends where neighbouring tenants require it, and the floor is cleaned at the end of every shift.
Crews are scaled to hit the tenant's move-in date. Deficiencies are cleared before the painter's walkthrough, and the space is handed over ready for flooring, millwork and furniture.
Private offices framed inside an occupied floor.




General contractors, property managers and landlords.
General contractors
We carry the interior wall and ceiling scope on GC-led fit-outs: framing, boarding, taping and ceilings under one contract. Bids are priced from the construction drawings and wall type schedule, with inclusions and exclusions listed, and the crew reports to your site superintendent.
Property managers and landlords
Suite turnovers, demising wall changes when a floor is split, corridor refreshes and repairs after leaks. We work to your building's construction rules and can provide budgets from a space plan before a tenant signs.
Tenants and designers
Where a tenant is managing its own fit-out, we work with the designer to confirm finish levels, feature wall locations and ceiling heights early, so the bid reflects the design intent rather than a template.
Sound-rated and fire-rated separations are built to the listed assemblies in the specification. See fire-rated drywall assemblies and T-bar and acoustic ceilings for the details.
Office fit-outs, answered.
Questions GCs, property managers and tenants ask before a fit-out starts.
Request a Bid
Fit-out on the calendar?
Send the space plan or construction drawings, the building address and the move-in date. We will return a scoped bid and a phasing plan that respects the building.
Request a Fit-Out Bid