Commercial and industrial drywall contractor in North York
Tenant fit-outs, base building drywall and ceilings along the Yonge and Sheppard corridors. Priced from drawings, self performed by our own crews.
What we build in North York
North York's commercial drywall work is concentrated in office and residential towers rather than industrial shells. The North York Centre district along Yonge, the Sheppard corridor and the Don Mills employment area carry a steady flow of tenant turnover, and most projects are fit-outs inside buildings that are occupied and running.
- Office and tenant fit-outs in multi tenant towers
- Base building corridors, lobbies and washroom cores
- Condominium amenity spaces, party rooms and gyms
- Medical and professional suites
- Fire-rated corridors, shaft walls and rated demising walls
- T-bar and acoustic ceilings, drywall ceilings and bulkheads
Fit-out work inside an occupied building
A North York tower fit-out is rarely limited by the drywall itself. It is limited by the building. Loading dock bookings, freight elevator windows, after hours noise restrictions and property manager rules decide how fast the work can actually go.
- Confirm the elevator and dock booking windows before the schedule is set, not after
- Establish the noise cutoff with property management and price the after hours portion honestly
- Plan material delivery in elevator sized loads rather than full pallets
- Hoard and dust control at the suite line so neighbouring tenants are not affected
- Book a separate patching visit after mechanical and electrical are complete
We have worked inside occupied buildings enough to know these constraints belong in the bid. Our office fit-out scope covers framing through finishing so the handoffs stay inside one contract.
Base building scope versus tenant scope
In a North York multi tenant tower, the drywall on a floor plate is usually split between two contracts. The landlord's base building scope covers the core and the common areas. The tenant improvement scope covers everything inside the demised premises. Where the line falls is set by the lease and the base building definition, not by the drawings, and the gap between them is where drywall scope goes missing.
| Element | Usually whose scope | Confirm before bidding |
|---|---|---|
| Corridor and elevator lobby walls | Base building | Whether the tenant side of the corridor wall is boarded |
| Demising walls at the suite line | Split, or negotiated | Which side is boarded and to what height |
| Core washrooms | Base building | Whether patching after tenant work is included |
| Perimeter and column furring | Varies by lease | Whether furring exists or has to be built |
| Ceilings inside the suite | Tenant | Whether base building grid is being reused |
| Shaft and riser enclosures | Base building | Whether new penetrations are being cut and by whom |
The item that catches people most often is the demising wall. A base building definition may deliver it framed and boarded on the corridor side only, leaving the tenant to board, insulate and finish their side. If your drawings show a finished demising wall without saying which side is existing, every bidder is guessing, and they will guess differently. Tell us what the base building actually delivered and we will price the remainder exactly.
Acoustic separation between suites
Demising walls between tenants are the item most likely to generate a complaint after occupancy. A wall that meets the drawing on paper can still fail in use if the assembly was compromised at the edges.
- The wall has to run to the underside of the structure, not stop at the ceiling, wherever the assembly requires it
- Every penetration needs to be sealed, including the ones the electrician adds after the wall is closed
- Back to back outlet boxes in a rated or acoustic wall defeat both ratings
- The perimeter and head of wall need acoustic sealant, and it needs to be continuous
- A tested assembly loses its rating if the stud spacing or the insulation is substituted
We build these to the listed assembly and we flag it at bid stage when a drawing shows a demising wall stopping at the ceiling line.
Working with us
We are a subcontractor. General contractors, developers and property managers send us drawings and we return a bid listing every partition type by tag, finish levels by area, and our exclusions in plain language.
- Two million dollar commercial general liability, certificate on request
- WSIB coverage in good standing
- Non-union open shop
- Framing, boarding, taping and finishing self performed
North York is a short run from our Richmond Hill base, which makes small return visits and punch list work practical rather than something we have to batch up.
North York drywall questions